E-Thematic
SEARCH:  
 


MOCONT-II


Personal information
 Created by:Rasmus Lindholm
 E-mail:r.lindholm@mail.ertico.com
 
Project details
 Title:MOCONT-II
 Acronym:MOCONT-II
 Start:04-01-2002
 Duration in months:12
 Project website:http://www.mocont.org/
 Project e-mail:silvana@dibe.unige.it
 
Executive summary
 MOCONT-II Abstract
MOCONT-II is a complete set of field trials performed the results of a previous IST project named MOCONT (IST-1999-10057). MOCONT is a system to automatically track the containers inside a terminal from the reception to the delivery at the gate. Its main capabilities are the automatic identification of the container code and its location on the terminal yard, communicating that information to the Terminal Operating System. Starting from the first MOCONT prototype, MOCONT-II equips a fleet of 8 reach stackers with MOCONT technology and realises six months of tests in a container terminal in order to get to the verification and evaluation of the system impacts. So, the main objective of MOCONT-II is to verify the manifold impacts that MOCONT system has on the operation of a terminal container. Expected results are the analysis of impacts in terms of the average container handling time, terminal productivity, return of investment, working conditions, level of service and cost reduction.

Objectives
The objective of MOCONT-II is to verify the impacts MOCONT has on the operation of a container terminal. The specific target is to investigate the potential of MOCONT leading to a marketable industrial product. From an economic and financial point of view, the aim is to estimate the return of investment a terminal operator may have using MOCONT, together with the business opportunities for the supplier. Economic and financial analysis will be the key to show the benefits of the technology application. MOCONT-II will realise 8 replications of the MOCONT functional prototype in order to equip a fleet reach stackers. The fleet will operate for a period lasting 6 months and relevant data will be collected for off-line evaluation. The analysis will allow a thorough evaluation, ranging from the economic impacts on the terminal operation and management to the reduction of handling time, to the impact on the working conditions for the terminal workers.

Description of work
The work is divided into 4 work packages (WP), regarding the major activities to be carried out during the project. WP1 will establish the Project Management and Exploitation Boards. Then, the Overall quality plan will be issued, in order to set the quality requirements of the project. The project development will be monitored by the Project Management Board all along the project lifetime. WP2, Installation and set-up, regards the replication in 8 copies of MOCONT in order to equip a fleet of reach stackers. The 8 boxes will be installed and set-up activities will follow. A communication channel between the boxes and the TOS will be set-up. WP3 deals with measurement and evaluation of results. Tests will be defined and split into 2 groups: on and off-board tests. The on-board tests will monitor the behaviour of the reach stacker operations through the continuous measurement of sensible parameters. The off-board tests will consider all the interactions between each reach stacker and the TOS. Appropriate metrics and a complete set of evaluation means will be selected and adopted. Data collected will be subdivided in different groups according to their typology. The evaluation range will be wide, embracing technical, organisational, and business impacts, and further aspects like workers conditions and environmental impacts. WP4 is related to dissemination activities, quite critical being the beginning of the exploitation. Terminal operators will be invited to keep their eyes on the trials, putting into evidence the main features of the system and further development. Moreover, publicity actions will be carried on, presenting the project results at conferences, exhibitions and magazines. Reviews and recommendation for engineering and industrialisation of the system will be discussed during the trials.

Expected results
The trials will evaluate the impacts in terms of: container handling time, terminal productivity, return of investment, working conditions, quality of work for terminal workers, level of service for terminal clients, cost reduction.
 
Funding in KEUR
 EU:Yes
 
Company
 Companyname:Universita degli Studi di Genova
 Address:Via Balbi 5
 Postalcode:16126
 City:Genova
 Country:Italy
 Website:http://www.unige.it/
 
Project co-ordinator
 Firstname:Silvana
 Lastname:Dellepiane
 E-mail:silvana@dibe.unige.it
 Phone:+39-010-3532754
 Fax :+39-010-3532134
 
Documents
 FinalReport MONCENT.pdf (473KB)

Printerversion Printerversion